Avéro tower

Location                     Leeuwarden
Period                         2016/2017/2018

A problem at great height: the granite façade panels on the Avero tower had started cracking. This made inspection and repair necessary. Because the window washing installation on the building could not reach all panels and might cause further damage it was not suitable for the task. The obvious choice was to use rope access to perform the inspections and repairs on the 77 meter high tower.