FACADE INSPECTIon
Location Scheveningen
Period January 2018
Before our able to start the planned façade renewal the wall ties needed to be inspected. The building being located next to a busy street with tram tracks made the use of a cherry picker impossible. Instead Vandesky performed the inspection from the ropes, with minimal impact on the surroundings.